Applied Material Solutions (AMS)

Complete boiler room piping system for a 300 horse power water tube York Shipley process steam boiler. Piping systems included high pressure steam, condensate, steam header, feed water system, gas, blow-down and blow-down separator, exhaust stack, chemical skid, and boiler relief valves.


Dancing Goat Distillery

Installed complete process steam boiler room piping system for a 50 horse power flex tube Miura boiler. Organic-rated, high pressure steam system with all stainless steel piping. Piping systems included high pressure steam, condensate, steam header, feed water system, gas, blow-down and blow-down separator, exhaust stack, and boiler relief valves.


Mercyhealth Henry Palmer Building

Replaced existing boilers and piping with two higher-efficiency Laars MagnaTherm, 2 million BTU hot water boilers. Piping included new, vertical, 8” exhaust through three-story building.


Mercyhealth North

Removed three 750,000 BTU heating boilers and installed two new 1 million BTU, HTP boilers while keeping the system operational.


Seneca Foods Corporation Pouch

Installed 850 HP process steam Cleaver Brooks boiler and all associated piping and accessories. Piping systems included high pressure steam, condensate, steam header, feed water system, gas, blow-down and blow-down separator, exhaust stack, chemical skid, and boiler relief valves.


Seneca Foods Corporation Simoneau

Modified building exterior for removal of existing Union 1,150 HP process steam boiler. Disconnected all components, rigged, lifted and removed boiler from site. Relocated 2,300 HP Simoneau process steam boiler with stack economizer. Oversaw soil borings for structural slab design, removed existing slab, excavated and installed new structural slab for 120,000 lb. flooded boiler. Piping systems included high pressure steam, condensate, steam header, feed water system, gas, blow-down and blow-down separator, exhaust stack, chemical skid, and boiler relief valves.

Bloomington Meats

Replacement of existing boiler system. Installed new Aldrich 3 pass fire tube boiler with feed water and blow down system. Miscellaneous upgrades to existing facility piping and equipment. All work completed while keeping existing system on line and functional until turn over.